MIRAGE 1705 OUTLINE SPECIFICATIONS (PERFORMANCE) SPEC-01 DIV 01–06 OUTLINE 01 GENERAL: Owner-GC delivery · Attach A quote · Attach B CD draft · submittals · substitutions. 02 EXISTING: N/A greenfield · survey / geotech by Owner under PE. 03 CONCRETE: foundations, slabs, elev pit per geotech + PE · SSI as required. 04 MASONRY: optional shaft / veneer — only if type path requires. 05 METALS: misc steel, stairs pans ALT, embeds, HD by PE BOM. 06 WOOD: limited FRT if Type IIIA path · millwork L1 boutique. SPEC-02 DIV 07–10 OUTLINE 07 THERMAL/MOISTURE: WRB, insulation IECC, roof membrane low-slope, flashings, firestopping. 08 OPENINGS: storefront frames O1–O4 · punched PW · HM rated doors · hardware groups AOR. 09 FINISHES: per A5.1 · Type X at rated · LVP hospitality · CRAVE quarry/epoxy kitchen. 10 SPECIALTIES: signage, toilet accessories, fire extinguishers, postal/ADA. SPEC-03 DIV 11–14 OUTLINE 11 EQUIPMENT: food service equipment NIC owner/FS · fitness equipment NIC. 12 FURNISHINGS: FF&E NIC · window treatments Owner. 13 SPECIAL: none primary. 14 CONVEYING: elevator mid-rise passenger · shops govern · shaft per A3.2. SPEC-04 DIV 21–28 OUTLINE 21 FIRE SUPPRESSION: NFPA 13 wet · hood suppression CRAVE · see FP1.0. 22 PLUMBING: IPC · wet walls · grease · see P1.0. 23 HVAC: zoning M1.0 · sealed calcs required for permit. 26 ELECTRICAL: service allowance E1.0 · unit panels · FA. 27/28 COMMS/SECURITY: Owner vendors · pathway only unless noted. SPEC-05 DIV 31–33 + PROCUREMENT 31 EARTHWORK: civil PE · SWPPP. 32 EXTERIOR: courts, paving deferred parking called on C1.0. 33 UTILITIES: franchise ties · civil. PROCUREMENT: CFS kit per TAKEOFF-4 · US Frame Factory / multi-vendor RFQ. PERFORMANCE: quantities & geometry locked · engineering values by seal. END OF OUTLINE SPECIFICATIONS — expand to full CSI under AOR.