Mirage 1705 · Architect / engineer package

IFC-3.2au · Geometry locked · Ready for stamp after due diligence

Package status: Walls, pack, keys, kitchen stations, and grids are drawn in DXF (feet). Complete due diligence, then stamp. Do not redesign the plate, key count, dual entry, or CRAVEZ kitchen lock without a written owner change order.

1 · Import order

  1. Open 01-DXF-IMPORT/A1.0-L1-ARCH-IFC.dxf — units = feet
  2. Then A1.1–A1.4 (L2–L5)
  3. S2.0 framing + S1.0 foundation
  4. MEP1.0 / MEP1.1 / FP1.0
  5. PDF / SVG reference: 02-PDF-REFERENCE/
  6. Parking: 04-SITE-PARKING/ · Façade: 05-FACADE/ · Kitchen: 03-LOCKS/

2 · DXF inventory

FileContents
A1.0-L1-ARCH-IFC.dxfL1 Mirage 36′ | CRAVEZ 64′ · O1/O2 · 6×104 SF stations
A1.1–A1.4-*-ARCH-IFC.dxfL2–L5 keys · pack 30+6+30+6+28
S2.0-TYP-FRAMING-IFC.dxfFraming
S1.0-FOUNDATION-IFC.dxfFoundation
MEP1.0 / MEP1.1 / FP1.0MEP / fire

3 · Locked — do not redesign

4 · Stamp

  1. Import DXF → your titleblocks
  2. Due diligence (geotech, calcs, schedules as required)
  3. Stamp → Jefferson / OSFM

Folder: professionals/aor-transfer/ · Web: miragemanhattan.com/aor-transfer.html