MIRAGE 1705 · OWNER LOCK — F-FRONT (UNDER ~$100k ARCH UPGRADES) ================================================================================ Status: RECOMMENDED LOCK · Jul 20, 2026 Footprint: PERFECT RECTANGLE — no structural tower, no lost rooms/windows Spend: SOUTH FRONT ONLY · sides/rear stay base IMP ================================================================================ CRITICAL RULE (DO NOT VIOLATE) ------------------------------ The vertical “MIRAGE” feature is FAÇADE TREATMENT ONLY — NOT a real wall/tower. ✗ Do NOT build a 12–16′ wide projecting structural tower through hotel floors ✗ Do NOT eat center guest rooms or kill front windows ✓ 6–12″ deep aluminum / ACM / fiber-cement decorative skin on flat south wall ✓ Vertical wood-look or metal fins (applied) ✓ Backlit MIRAGE letters + LED accents ✓ Windows remain in the real wall BEHIND / BETWEEN the decorative skin Street reads “dramatic tower.” Plan stays a box. Waterproofing = cladding detail, not a new volume. DUAL ENTRIES (UNCHANGED FROM A1.0 / A2.0) ---------------------------------------- Left · O1 MIRAGE hotel lobby — strengthen with better canopy Right · O2 CRAVE — own identity (warmer storefront) · independent airlock SPEND ORDER (FRONT ONLY) ------------------------ 1. Front façade two-tone + decorative center skin / fins ~$25–40k 2. Main hotel canopy (serious, ~12–15′ — not 20′ palace) ~$35–50k 3. CRAVE storefront warm-up (mullion/sign/glow) ~$12–20k 4. Lighting (canopy + center mark + CRAVE wash + crown) ~$15–25k 5. Signage (MIRAGE vertical + CRAVE) ~$8–15k ------------------------------------------------------------ TARGET TOTAL ~$95–$130k Stretch ceiling ~$150k Sides / rear $0 delta (base IMP) WHAT THIS BUYS (LOOKS LIKE MORE THAN IT COSTS) ---------------------------------------------- · Fiber cement or ACM color-block (not full rainscreen rebuild) · Shallow decorative center feature (6–12″) · One hero canopy + light · Restaurant personality at glass you already have · Crown LED strip ANTI-MOTEL RULES (must look $5k/mo tier — still in F-FRONT budget) ------------------------------------------------------------------- · NO through-wall PTAC under windows (use VRF/PTHP per MEP — hide equipment) · NO cheap white horizontal sliders — dark bronze aluminum punched / storefront · NO chunky gas-station porte columns — slim canopy / elegant drop · NO sparse “empty lot + plastic sign” look — pavers at entries + planting + uplights · Warm limestone-look / sand panel + charcoal accent (not motel beige grid) · Soft linear canopy LED + crown — not harsh floods · Target comps: boutique hospitality / premium monthly — not roadside motel SKIP (saves money, little drive-by loss) --------------------------------------- · Side / rear upgrades · Structural Mirage tower · South walk-out balconies · Sconce on every pier · Full building re-clad CONSTRUCTABILITY ---------------- · Attach skin to CFS/sheathing per PE (160 mph Exp C C&C) · Continuous WRB behind decorative skin — windows flash as usual · Canopy separate PE attachment to structure · No change to A1 floor plans / unit SF / joist spans OWNER INITIALS -------------- ___ LOCK F-FRONT (~$100k front-only) — recommended ___ F-FRONT + L5 pool balconies later (+$20–30k) ___ Defer Next drawings if locked: revise A2.0 south elev notes + canopy/skin details only. ================================================================================