OWNER = GC · BID SHEET LOCKED · STEEL RFQ OPEN

Bid checkoff · LOCKED ~$3.68M

All divisions locked below. Capital ask ~$3.7M at steel WORKING $1.15M (Element/RSMeans/LA-audit sourced). Stretch RFQ ≤$1.0M → ~$3.53M. Elev + FP must fit Div 07 $420k.

~$3.24MBuild · steel mid $1.15M · pool IN
~$435kLand (locked)
~$3.68MAll-in working · ask ~$3.7M
$1.15MSteel WORKING · ≤$1.0M = stretch
DivFull checkedLOCKED ~$3.7MStatus
01 Site + util + lights + dumpster$290k$200k✓ LOCKED
02 Foundations + geotech$190k$165k✓ LOCKED · no piles
03 CFS/steel dried-in$1.62M$1.15M✓ LOCKED WORKING · RFQ
04 L1 + CRAVE$240k$210k✓ LOCKED
05 · 56 keys finish$550k$500k✓ LOCKED
06 Wellness$0$0KILLED
07 MEP · elev · FP · LV · grease$545k$420k✓ LOCKED · bid cap
08 Court · pool · monument$140k$125k✓ LOCKED · pool IN
09 Soft · PE · permits · BR · OH$265k$180k✓ LOCKED
10 Envelope · dual storefront · stairs · windows$220k$140k✓ LOCKED
11 Contingency$325k (8%)$150k (~5%)✓ LOCKED
GC hard~$4.39M~$3.24M
+ Land$435k$435,000✓ lock
All-in~$4.83M~$3.68M~$3.7M working ask

Working capital ask = ~$3.7M all-in (steel mid). Hold ~$3.5M only if RFQ ≤$1.0M. Piles / elev+FP blowout still kill lean path.

~$3.7M WORKING · LOCKED (Jul 20)

Every line below is owner-locked. Steel WORKING = $1.15M (sourced mid). RFQ ≤$1.0M is stretch only — see Steel gate.

DivWas checkedLOCKEDSaveHow
01 Site$290k$200k−$90kLean lights · defer dumpster polish · tap deposits owner-side
02 Found$190k$165k−$25kLean geotech · no piles
03 Steel$1.62M$1.15M−$470kWORKING mid · ≤$1.0M = stretch · see gate
04 L1 CRAVE$240k$210k−$30kDefer acoustic upgrade
05 Keys$550k$500k−$50kOne SKU finish · sharp crew (floor ≥$480k)
06 Wellness$0$0Killed
07 MEP/elev/FP$545k$420k−$125kBid cap · competitive elev + lean FP · LV minimal
08 Court/pool$140k$125k−$15kPool IN ($85k) · lean monument only
09 Soft$265k$180k−$85kPhased PE · lean BR
10 Envelope$220k$140k−$80kLean storefront · fewer window types
11 Contingency$325k$150k−$175k~5% on lean hard
Build~$4.39M~$3.24M−$1.15M
+ Land$435k$435k
All-in~$4.83M~$3.68M~$3.7M working

Steel gate · HARD pricing (sourced) Jul 20

Numbers below are from published comps / RSMeans citations — not a sealed Mirage bid. Harvey 160 mph Exp C is harder than the Element Hotel wind case (112 mph Exp B).

A · Published framing $/SF (what “frame” means)

SourceWhat it is$/SF× 55k Mirage
Element Hotel · Richmond VA
US Frame Factory · Scottsdale case · late 2025
8-story · 110k SF · CFS walls+joists package
materials only · labor + sheathing OUT · wind 112 mph Exp B
$11.34 $624k mat only
RSMeans 2024 (via AAC / SFIA cites) CFS framing material $12–16 $660–880k mat
RSMeans 2024 Boston (AAC mid-rise cite) CFS framing @ 5–7 stories (installed band) $24–26 $1.32–1.43M
LA line audit (owner file · Harvey) Multi-story steel L2–L5 + roof + panels + erect LO $0.95–1.1M · AVG $1.3–1.6M

B · Build-up for Mirage Div 03 (Element mat + erect + roof)

BandMat @ $11.34ErectRoof + sheathDiv 03 total$/SF GBA
LO$624k$220k ($4/SF)$130k$0.97M$18
MID$624k$302k ($5.5/SF)$210k$1.14M$21
HI$624k$385k ($7/SF)$300k$1.31M$24
+ Gulf wind premium160 mph Exp C vs Element 112 mph Exp B — expect +10–25% on structure~$1.05–1.45M

C · Verdict for this deal

Line$Basis
Div 03 WORKING$1.15MElement build-up mid + modest Gulf bump · matches LA audit LO–mid
Div 03 STRETCH$1.00MLO path · competitive CFS panel · lean roof/sheath · no sealed U.S. 5-story proof
Div 03 if RSMeans Boston band$1.32–1.43MInstalled framing cite — treat as ceiling until RFQ
All-in @ steel $1.15M + pool IN~$3.68MAsk ~$3.7M
All-in only if steel ≤$1.0M~$3.53MHold $3.5M ask

Hard truth: Element proves ~$11–12/SF materials is real for CFS hotel framing — that is ~$0.62M mat on 55k, not a $1M all-in shell. Dried-in (mat+erect+roof/sheath) clusters ~$1.0–1.4M before glass/MEP/keys. Foundation is Div 02 (separate).

RFQ same scope: Path A BASE · 100′×110′×5 · 160 mph Exp C · Butler · Nucor · VP · Cornerstone · ClarkDietrich / US Frame Factory-class CFS. Cite: Element Hotel $11.34/SF · AAC/RSMeans CFS $12–16 mat / $24–26 @ 5–7 · owner LA audit $0.95–1.6M.

Buy-order gaps (get these first)

PriorityItemStatus
1CFS RFQ · Path A · working $1.15M · stretch ≤$1.0MGATE OPEN
2Elevator · 5-stop installed · fits Div 07 $420k capOPEN
3NFPA 13 + FA · 55,000 SF · fits Div 07 capOPEN
4Geotech · must be SOG (no piles)NEED
5Impact glazing / dual storefront · lean package ≤$140k Div 10NEED
6Utility tap letters (Entergy · water · sewer)NEED
73× finish-crew bids · Div 05 + ALT-INT studsNEED

Div 01 · Site · util · lights · dumpster ✓ LOCKED → $200k

LineResearchFullLOCKED
Clear · Zone X bowlLean clear · stumps in$7k$7k
Soil · grade · building padFFE = street CLS + 6″ · free spoil Plan A$45k$45k
Detention · SWPPP · rough drainageCivil PE$20k$18k
Asphalt parking ~100 stallsParish hard-surface required$113k$95k
Base landscape · stripe · ADAAE neck = landscape/drive only$15k$10k
Utility taps (water/sewer/power stub)Owner deposits where possible$40k$12k
Site + parking lightingPhase half · keep life-safety$35k$5k
Dumpster / enclosure / grease padFunctional · not polished$15k$8k
Div 01$290k$200k

Div 02 · Foundations + geotech ✓ LOCKED → $165k

LineResearchFullLOCKED
Geotech reportWest Bank · decide SOG vs piles before pour$25k$20k
Footings · SOG 11,000 SF · elev pitLean commercial · no piles$165k$145k
Pile ALT (if geotech requires)Breaks lean ask — not in lockTBD$0
Div 02$190k$165k

Geotech must clear SOG. Piles = raise ask.

Div 03 · CFS / steel dried-in WORKING → $1.15M · stretch $1.0M

LineBasis (Path A · BASE only)Full placeholderWORKING
CFS BASE delivered (~96 ton)~$2,700–3,800/ton · no ALT-INT$1.10M$650k
Erect · crane · weather-in~$5–6/SF GBA mid$350k$300k
Roof membrane / insulationLean · if not in kit$110k$140k
Opening frames onlyGlass in Div 10$60k$60k
Div 03$1.62M$1.15M

GATE: ALT-INT corridor studs (~96 ton) stay with Div 05 finish crew — not this RFQ. See Steel gate. Do not lead with “hotel.”

Div 04 · L1 + CRAVE ✓ LOCKED → $210k

LineResearchFullLOCKED
Stain / polish L1 11,000 SF~$2–4/SF$28k$28k
6 kitchen bays · sinks · grease · powerRough-in only · no cook line$55k$55k
Type I hood · duct · Ansul · MUATurnkey hood line$48k$48k
Bar roughStubs · cold · drain · power$18k$18k
Lobby · fitness shell · RRs · BOH · paint$61k$61k
Acoustic demising kitchens ↔ residencesDeferred for lean lock$30k$0
Div 04$240k$210k

NIC: chef cook lines · smallwares · bar FF&E · dining furniture.

Div 05 · 56 residences finish ✓ LOCKED → $500k

Finish only after dried-in + MEP rough. Mix: 48×610 + 8×850. Includes ALT-INT corridor/demising studs labor (not in steel RFQ).

CategoryFullLOCKED
Materials · all 56 · one SKU$240–300k$230k
Labor · finish crew (+ ALT-INT studs)~$290k$270k
Div 05$550k$500k

NIC: furniture · mattresses · TVs · appliances · linens · décor. Floor ≥$480k.

Div 06 · Wellness KILLED → $0

LineNotesCheck
Salon / beauty chair buildoutRemoved from program · Harvey has suite supply · keep all 56 keys$0

Do not bid Div 06. SF stays residences / circulation / fitness amenity only.

Div 07 · MEP · elev · FP · LV · grease ✓ LOCKED cap → $420k

LineResearchFullLOCKED cap
Electrical service · panels · branchHouse + L1 heavy$120k$100k
HVAC · PTACs + L1 zones56 units + L1 RTU lean$85k$75k
Plumbing risers · WH$70k$60k
Grease interceptorCRAVE required$25k$25k
ONE elevator · 5-stop installedCompetitive bid$95k$80k
NFPA 13 + FALean ~$2/SF floor$110k$60k
Low voltage · data · access · cameras · POS backboneMinimal open$40k$20k
Div 07$545k$420k

Bid cap: elev + sprinkler must fit — get those bids first. Blow past $420k → raise ask.

Div 08 · Court · pool · monument ✓ LOCKED → $125k · pool IN

LineResearchFullLOCKED
Court hardscape · lightsLean$12k$12k
Simple canopy / porte$8k$8k
Pool 12′×20′ + spa bareIN day-1 · amenity for residences$85k$85k
Stripe · ADA (w/ civil)$10k$10k
Monument / dual-entry signageTemp vinyl first$25k$10k
Div 08$140k$125k

Div 09 · Soft · PE · permits · BR · OH ✓ LOCKED → $180k

LineResearchFullLOCKED
AOR · civil / structural / MEP PEPhased stamps$120k$90k
Permit · impact · tap fees$45k$35k
Builder’s risk sized to ~$3.5MLean to ask$55k$30k
GL · temp · misc OHYou are GC$45k$25k
Div 09$265k$180k

Div 10 · Envelope openings · stairs · wind ✓ LOCKED → $140k

LineResearchFullLOCKED
Dual storefront MIRAGE + CRAVEImpact · lean package$75k$50k
Windows / openings L2–L5Fewer types · 160 mph$95k$60k
2 stair towers finishStructure in Div 03$50k$30k
Div 10$220k$140k

Div 11 · Contingency ✓ LOCKED → $150k (~5%)

LineBasisFull 8%LOCKED
Owner-GC contingency~5% of lean hard (~$2.86M)$325k$150k

Tighter because RFQs must be real before close. Do not cut further to fake $3.5M.

NIC · not in GC totals (stamp on every bid form)

  • Furniture · mattresses · TVs · linens · décor
  • Residence appliances
  • Chef cook lines · smallwares · hood extras beyond shell
  • Bar FF&E · POS terminals (backbone in Div 07)
  • Operating inventory · liquor stock
  • Wellness / salon chairs (program killed)

Capital stack · LOCKED ~$3.7M

A · Full checkedB · LOCKED ~$3.7M
01–05 · 07–10 hard$3,735,000$2,910,000
06 Wellness$0$0
03 Steel (in hard above)$1.62M in A$1.15M WORKING
09 Soft$265,000$180,000
11 Contingency$325,000$150,000
GC hard~$4.39M~$3.24M
Land$435,000$435,000
All-in~$4.83M~$3.68M

Buy order: (1) steel RFQ Path A/C · (2) elev · (3) sprinkler · (4) geotech SOG · (5) lean glazing · (6) concrete · (7) finish crew ×3 · (8) pool IN day-1 ($85k) — do not phase amenity for $85k.

Lender door = Column B — land $435k + lean · steel WORKING $1.15M · stretch ≤$1.0M for $3.5M ask. lender.html