CONTRACTOR MATERIAL PACKAGE · 100% PROJECT · Jul 12, 2026

Materials · entire job

Takeoff for GC / suppliers. Quantities from locked program — confirm on sealed CDs. Pair with owner-GC checkoff.

Project lock

ItemLock
Address1705 Manhattan Blvd · Harvey LA 70058 · PLS #8387
Footprint / floors / GBA100′-0″ × 110′-0″ · 5 levels · 55,000 SF
Productmonthly hotel residences · 30+ nights · 56 keys
Mix48 × 610 SF (20′-4″×30′) + 8 × 850 SF (28′-4″×30′)
L136′ Mirage | 64′ CRAVE · stained concrete entire floor
Core1 elevator · 2 stairs · 6′ halls + 6′ link
Also inWellness · fitness shell · pool 12′×20′ · court · ~100 parking

GC = furnish & install in hard bid   OWNER = owner retail cart (not GC markup)

01 · Civil / site materials

MaterialQtyUnitNotes
EARTH / PAVING
Temp fence panels + stands~800LFsite perimeter
SWPPP silt fence / inlet protection1LSpermit set
Structural fill (import)TBDCYper geotech
Asphalt paving · binder + surface~45,000SFdrives + parking (not PICP)
Base course crushed stone~45,000SFunder pave
Concrete curb / gutter~1,200LFneck + islands
Parking stall stripe paint + ADA symbols~100stalls+ fire lane
UTILITIES
Domestic water service + meter assembly1EAsize per PE
Backflow preventer1EA
Fire service stub + PIV1EA
Sanitary lateral + cleanouts1LS
Grease interceptor1EACRAVE · size per code
Storm pipe / structures / detention media1LScivil H-1
Electrical conduit to transformer pad1LSutility coord
Transformer pad concrete1EA

02 · Concrete / foundations

MaterialQtyUnitNotes
Ready-mix concrete · slab-on-grade~200CY11,000 SF × ~6″ + waste
Ready-mix · footings / turn-downs~80CYconfirm PE
Ready-mix · elevator pit walls/slab~12CY1 pit
Vapor barrier 15-mil12,000SF+ overlap
Rebar / WWF as PE1LSshop from PE
Anchor bolt assemblies1setper steel package
Under-slab sleeves (plumbing/elec)lotcoord MEP
Pit waterproofing / sump basin1EA
Concrete stain / densifier / sealer system11,000SFENTIRE L1 · one trade
Optional corridor stain L2–L5~6,000SFif elected

03 · Structural steel / metal building

MaterialQtyUnitNotes
Primary frames / columns / rafters1bldg100×110 · 5-story eng. package
Secondary · purlins / girts / bracing1LSin steel RFQ
Metal floor deck L2–L544,000SF4 × 11,000
Concrete on deck (if composite) or LGS floor44,000SFper PE system
Roof deck / standing seam or panel roof11,000SF
Roof insulation11,000SFcode R
Gutters · downspouts · scuppers1LS
Stair steel pans / stringers (2 stairs)2shafts× 5 levels
Handrails / guardslotcode
Elevator hoistway embeds / sill angles1shaft

04 · Envelope / openings

MaterialQtyUnitNotes
Insulated metal wall panels · standard~18,000SFapprox elevations · confirm
Trim · corners · base · flashings1LSwith panels
L1 storefront / entrance systems (2 doors)2EAMIRAGE + CRAVE · impact
CRAVE bifold / multi-slide (court)~45LFif in scope
Punched windows L2–L5 residences~168EA~3/key × 56 · confirm elev
Unit entry doors · solid core + frames + hardware56EA+ cores
Stair / exit doors + panic hardware~8EAcode
Louver / vent openingslotMEP
Sign blocking / outriggers2brandletters OWNER

05 · Interior framing / drywall

MaterialQtyUnitNotes
Metal studs · demising / corridors / units~55,000SF wallorder of mag · takeoff CDs
Track / channel / fasteners1LS
Gypsum board · standard~90,000SFboth sides approx
Gypsum · Type X (shafts / corridors / demising)lotSFfire rating
Shaftliner / chase walls at wet stacks56stackscorridor wet walls
Insulation · batt acoustic demisinglotSFSTC target
Joint compound · tape · corner bead1LS
Blocking · cabinets / grab bars / TVs56keys

06 · Doors · hardware · millwork

MaterialQtyUnitNotes
Passage doors interior (bath/BR/closet)~220EA~4/key × 56
Passage hardware sets~220EAbuilder grade
Deadbolt / smart-lock prep on unit entries56EAlock OWNER
Kitchen base/upper cabinets · 61048setsbuilder · ~9′ run
Kitchen cabinets · 8508sets~ longer run + island
Island cabinets 610 (5′-6″)48EA
Island cabinets 850 (8′)8EA
Vanity cabinets · baths~64EA48×1 + 8×2
Laminate / quartz tops (GOOD)56+keyskit + vanity
Lobby desk / check-in millwork1EAsimple

07 · Finishes

MaterialQtyUnitNotes
Interior paint · walls/ceilings~110,000SFone painter volume
LVT plank · residences~36,000SFunit living areas
Ceramic / porcelain tile · baths wet~8,000SFfloors + shower walls
Shower pans / bases or curb + liner~64EAbaths
Glass shower doors or curtains + rods~64EAbuilder
Bathroom accessories sets~64EAtowel / paper / grab as req
Mirrors · bath~64EA
Corridor floor finish L2–L5~6,000SFLVT or stain
Base · rubber or wood~12,000LF
Acoustical ceiling (L1 public if used)allowSFor exposed/paint

08 · Plumbing materials

MaterialQtyUnitNotes
Water heaters (central or per-floor / per-unit)TBDEAPE design
Toilet · elongated · elongated seat~64EAbaths
Lavatory faucet~64EA
Shower valve + trim + head~64EA
Kitchen sink + faucet56EA
Garbage disposal (optional)56EA
Washer box + valves56EA
W/D drain / standpipe56EA
Copper / PEX / PVC DWV risers1LSstacked wet walls
Floor drains · public / BOHlotEA
Public RR fixtures · toilets · lavs · urinals1setL1 ADA
CRAVE kitchen sinks · hand sinks · prep6+bayslicense bays
Grease waste piping to interceptor1LS

09 · Electrical materials

MaterialQtyUnitNotes
Main service gear / switchboard1EAload calc
Metering / CT cabinet1LS
Panels · distribution + subpanels~12+EAL1 + floors
Unit load centers / breakers56EA
EMT / MC / wire (building)1LStakeoff CDs
Devices · outlets / switches~1,200EA~20/key + public
GFCI / AFCI as codelotEA
LED fixtures · residences~500EAbuilder cans/surface
LED fixtures · corridors / L1 / stairslotEA
Exit / emergency lightslotEAcode
Site light poles / heads~12EAphotometric
Data / coax stubs per key56keysAP OWNER
EV / future conduits (optional)allow

10 · HVAC materials

MaterialQtyUnitNotes
PTAC or ductless mini-split · residences56EAVE preferred vs VRF
L1 RTU / split systems · lobby / CRAVE / fitness3–5EAPE size
Kitchen makeup air unit1EAwith hood
Type I hood + duct + fan + Ansul1systemCRAVE
Bath exhaust fans~64EA
Dryer vents · roof/wall jacks56EA
Thermostat / controls56+EA
Refrigerant line sets / condensate56setsif splits

11 · Fire protection · elevator

MaterialQtyUnitNotes
Sprinkler pipe · fittings · hangers55,000SF cov.NFPA 13 wet
Sprinkler heads~700EA~1/80 SF order
Fire pump (if required)0–1EAcalc
Standpipe / FDC / valves1LS
FA panel · smoke · pulls · horns/strobes1systemfull bldg
Monitoring dialer / cellular1EA
Passenger elevator · MRL cab + controller1EA5-stop
Elevator hall stations / lanterns5floors

12 · CRAVE · bar · fitness (wellness killed)

MaterialQtyUnitNotes
Kitchen bay partitions / SS tables rough zone6bays
3-comp / prep sink rough-ins6EA
Gas / electric drops per bay6setsPE
Bar undercounter stubs · cold · drain · power1bar
Beer/glycol chase conduit (optional)allow
Wellness wet wall bowls + drains~24–48EAgrid
Wellness station power/datasameEA
Fitness room — outlets + paint only1room≤$5k hard
Fitness equipment / mats / mirrors1kitOWNER
Wellness chairs / toolsKILLED · not in program

13 · Pool · court · porte

MaterialQtyUnitNotes
Pool shell 12′×20′ (gunite/vinyl/kit)1EAbare package
Spa / hot tub adjacent1EA
Pool equipment pad · pump · filter · heater1set
Pool fence / gate · code1LS
Court hardscape pavers or broom concrete~2,600SFCRAVE court
Court drainage · trench drain1LS
Court base lightinglotEA
Porte canopy structure · simple1EA
Bollards~6EA

14 · Owner FF&E / appliances OWNER · NOT GC

Retail / warehouse bulk. Same SKU every key. ~$205k cart target.

Item610 ×48850 ×8Total
Queen mattress + frame488 + 8 BR264 beds
Sofa / loveseat48856
Dining 2-top + seats48856
Nightstands + lamps9624120
TV 43–50″48856
Apartment fridge48856
Electric range48856
Microwave48856
Stacked W/D or combo48856
Linens / towels starter48856 kits
Smart locks / Wi-Fi APs5656+

Procurement rules

  • One trade · one bidder for stain, paint, tile, LVT, panels, civil, steel.
  • Repeat SKUs only — no custom millwork per key.
  • GC installs pathways for OWNER appliances (water · drain · power · vent).
  • Final quantities from sealed AOR/PE CDs supersede this schematic takeoff.
  • Bid against filled schedule: GC hard $2,075,000.

Owner-GC checkoff → Email package