Architect / engineer stamp package · IFC-3.2au only
Full blueprints → Takeoff → Preview →
Stamp package · Mirage 1705
This folder is the only current set (professionals/aor-transfer/).
Older through / Rev J packs conflict — don’t use them. Ready for stamp after due diligence.
Locked program —
100′ × 110′ × 5 · H = 64′ · 56 residences · dual entry MIRAGE + CRAVEZ · ~100 parking ·
RC III · 160 mph Exp C · Type III-A · NFPA 13.
Stamp path:
Due diligence → stamp. Geometry and rooms are drawn. Import DXF (feet), run DD checks, apply seals.
Workflow
- Open the drawings
- Import
01-DXF-IMPORT/(units = feet) - Confirm site / parking · façade · kitchen lock
- Complete due diligence (geotech, calcs, schedules as needed)
- Stamp → Jefferson / OSFM
1 · CAD / DXF
★ Import guideFile order · layers · plate lock.
A1.0 L1 Arch DXFMirage 36′ | CRAVEZ 64′ · kitchen stations.
A1.1 L2Arch DXF.
A1.2 L3Arch DXF.
A1.3 L4Arch DXF.
A1.4 L5Arch DXF.
S2.0 FramingStructural DXF.
S1.0 FoundationFoundation DXF.
MEP L1MEP DXF.
MEP typicalMEP DXF.
FP sprinklerFire DXF.
2 · Dimensioned drawings & façade
A1.0 L1 dimensionedTrue-scale L1 SVG.
Arch floors + elevationsDrawing book PDF.
Through drawingsIFC through PDF.
A2.0 South façadeDimensioned elevation.
F-FRONT façade lockStreet façade criteria.
F-FRONT cameraResidences + CRAVEZ.
3 · Site & parking
H-1 · 100 parkingCivil parking layout.
C0.0 Site civilSite PDF.
Site planPNG.
Parking lockCount and rules.
4 · CRAVEZ kitchen
Contractor layout lockAuthority plate.
Kitchen layout6 × 104 SF · linear pass.
Enlarged kitchenKitchen SVG.
K1.0 NFPA 96Hood / kitchen fire.
6 · CFS takeoff (CAD-corrected)
★ Takeoff pageCorrected BOQ on site · old numbers called out.
CFS-TAKEOFF-BOQ.csv8,526 LF joists/floor · 35,560 unit SF.
Framing truthWhy prior takeoffs failed.
Discipline map
| Discipline | In this package | Stamp |
|---|---|---|
| Architecture | DXF · dims · façade · kitchen | After DD |
| Structural | Framing · foundation DXF | After DD / geotech |
| Civil | H-1 parking · site | After DD |
| MEP | MEP DXF · criteria | After DD |
| Fire | FP DXF | After DD |