STAMP PACKAGE · Jul 2026
Schematic set only.
Not a permit submittal.
25 coordination sheets cover discipline placeholders — architecture · structure · civil · MEP · fire. Useful for pre-app and AOR/PE handoff. Ready for stamp after due diligence. Geotech · ALTA · full engineering calcs · specs · Jefferson OK required before any permit submittal or field work.
Stamp path: Complete package at aor-transfer.html · due diligence → stamp. Permit path →
Schematic coordination viewer · 25 sheets
STAMP PACKAGE · drawing package underlay for AOR/PE handoff · 55,000 SF GBA · 56 residence keys · CRAVE · MIRAGE lobby · fitness · grand court · wellness killed.
Engineering calcs · summaries
Load assumptions · code locks
| Document | Covers | Status |
|---|---|---|
| P3-M1-1 · Electrical load calc | 200–350 kW preliminary · 200A vs 400A service · all-electric kitchen | Preliminary · EE seal |
| P3-M0-1 · Plumbing | Grease interceptor · 28′ Type I hood · sewer/water sizing | Preliminary · PE seal |
| P3-M2-1 · HVAC / exhaust | RTU · hood makeup air · PTAC hotel × 48 · NFPA 96 | Preliminary · ME seal |
| P3-FP1-1 · Sprinkler | NFPA 13 · hotel L2–L3 · A-2 exemption TBD Fire Marshal | Preliminary · FPE seal |
| P3-A3-2 · Restrooms | 8 public stalls · 2 banks · ADA · no RR through kitchen | Preliminary · AOR seal |
| P3-C0-1 · Civil grading | 100 stalls · one-way loop · detention · FFE @ ALTA | Schematic · Civil PE seal |
| P3-S0-1 · Structural notes | ASCE 7-22 · 150 mph wind · PEMB 25′ grid · slab-on-grade | Preliminary · PE seal |
Jefferson Parish · pre-application
Pre-app + stamp checklist
Still external · before permit
What licensed pros must still produce
- Geotechnical report — slab/spread footings @ Zone X bowl
- Certified stamped ALTA — FFE · easements · utility verification
- PEMB vendor PE-stamped shop drawings — connections · anchor bolts
- Jefferson written pre-app OK — staff conference items 1–3 + E1
- Energy / COMcheck — AOR @ seal
- CSI specifications — AOR spec book @ 100% CD