CFS / steel procurement · sheet index
Quote pack + sheet index.
For vendor RFQ and takeoff. Primary AOR / PE stamp package (DXF + parking + façade + kitchen): aor-transfer.html →
Primary downloads
★ CFS TAKEOFF (CORRECTED)BOQ on site · 8,526 LF joists · 35,560 unit SF — use this
★ STAMP PACKAGEDXF · dims · façade · parking · kitchen
CFS-TAKEOFF-BOQ.csvCAD-corrected Jul 20 · synced
CD DRAFT PDF · ~40 sheetsMerged sheet index · G/C/A/S/MEP outline
FULL QUOTE PACKAGEInvite · criteria · TAKEOFF-4 · method · A0–A5 · Attachment A
CFS TAKEOFF PDF (Jul 15 — verify vs CSV)Prefer takeoff.html / corrected CSV if PDF still shows 7,890 LF
5-STORY STEEL RFQ FULLBID-3 RFQ drawings · CFS explicitly allowed
CD SCHEDULES.csvOpenings · partitions · finishes · unit tags
AOR / PE HANDOFF MEMOWhat’s locked vs what you stamp
OUTLINE SPECS Div 01–33Performance outline pointing drawings + takeoff
LAYOUT LOCKOwner plate lock HTML · Jul 12 geometry
PROPOSAL DRAWINGS 100×110×5Steel-ask package A0–A5 set
STEEL ASK RFQVendor cover + criteria
VENDOR EMAIL DRAFTSend Attach A + B template
CD Draft sheet index (individual PDFs)
Same 40 sheets as the merged PDF — open one at a time if needed.
G0.0 Cover / index / seals
G0.1 Code analysis
G0.2 Symbols / notes
G0.3 Life safety
C1.0 Site schematic
A1.0 L1 plan
A1.1 L2 plan
A1.2 L3 plan
A1.3 L4 plan
A1.4 L5 plan
A2.0 South elev
A2.1 North elev
A2.2 East elev
A2.3 West elev
A3.0 Building section
A3.1 Wall section
A3.2 Shafts
A4.0 Units 610/850
A5.0 Openings
A5.1 Finishes
A5.2 Partitions
A6.0 RCP typical
S0.1 Struct notes
S1.0 Grid / foundation
S2.0 L1 framing
S2.1 Upper framing
S2.2 Roof
S3.0 Shear
S4.0 Details
S5.0 Takeoff sched
S5.1 Takeoff cont
FP1.0 Sprinkler
M1.0 HVAC
E1.0 Electrical
P1.0 Plumbing
SPEC-01 Div 01–06
SPEC-02 Div 07–10
SPEC-03 Div 11–14
SPEC-04 Div 21–28
SPEC-05 Div 31–33